(812) 309-78-59
(495) 223-46-76
IEC 61784-5-2:2018 ed4.0
Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2
163 стр.
Действует
Электронный (pdf)Печатная копия
573.30 CHF (включая НДС 20%)
Разработчик:
Зарубежные/IEC
ICS:
25.040.40 Industrial process measurement and control / Измерение и контроль производственного процесса35.100.40 Transport layer / Транспортный уровень
Описание
IEC 61784-5-2:2018 specifies the installation profiles for CPF 2 (CIP™ ). This contribution contains a number of related files covering the communication profiles to be used in conjunction with IEC 61918. The installation profile documents contained herewith provide the installation profiles of the communication profiles (CP) of a specific communication profile family (CPF) by stating which requirements of IEC 61918 fully apply and, where necessary, by supplementing, modifying, or replacing the other requirements. The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918. This fourth edition cancels and replaces the third edition published in 2013. This edition constitutes a technical revision.
This edition includes the following significant technical changes with respect to the previous edition:
a) references to ISO/IEC 24702 have been replaced with references to ISO/IEC 11801-3 in Table B.1;
b) errors have been corrected;
c) Tables B11 and B13 have been added in support of 1,000 Mb/s 4 Pair Ethernet;
d) Clarification of dual power supplies for Annex C.