- a
the preparatory steps to test experimental Type II, III, and IV fluids according to AMS1428;
- b
the recommendations for the preparation of samples for endurance time testing according to ARP5485;
- c
a short description of wind tunnel testing;
- d
a short description of the recommended field spray test;
- e
the protocol to generate draft holdover time guidelines from endurance time data obtained from ARP5485;
- f
the protocol for inclusion of Type II, III, and IV fluids on the FAA and Transport Canada lists of fluids and the protocol for updating the lists of fluids;
- g
the role of the SAE G-12 Aircraft Deicing Fluids Committee;
- h
the role of the SAE G-12 Holdover Time Committee; and
- i
the process for the publication of Type II, III, and IV holdover time guidelines.