(812) 309-78-59
(495) 223-46-76
IEC PAS 62381:2004 ed1.0
Activities during the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) for automation systems in the process industry
35 стр.
Заменен
Электронный (pdf)Печатная копия
384.94 CHF (включая НДС 20%)
Разработчик:
Зарубежные/IEC
ICS:
25.040.01 Industrial automation systems in general / Промышленные автоматизированные системы в целом
Описание
defines procedures and specifications for the factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.