(812) 309-78-59
(495) 223-46-76
ASTM D2321-11
Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
12 стр.
Заменен
Печатное изданиеЭлектронный (pdf)
107.64 $ (включая НДС 20%)
Разработчик:
Зарубежные/ASTM
ICS:
23.040.20 Plastics pipes / Пластмассовые трубы
Сборник (ASTM):
08.04 Plastic Piping Systems (I): D1598 – F2735 / Пластиковые трубопроводные системы (I): D1598 – F2735
Тематика:
Plastic Pipe
Описание
Значение и использование

This practice is for use by designers and specifiers, installation contractors, regulatory agencies, owners, and inspection organizations who are involved in the construction of sewers and other gravity-flow applications that utilize flexible thermoplastic pipe. As with any standard practice, modifications may be required for specific job conditions or for special local or regional conditions. Recommendations for inclusion of this practice in contract documents for a specific project are given in Appendix X2.

Область применения

1.1 This practice provides recommendations for the installation of buried thermoplastic pipe used in sewers and other gravity-flow applications. These recommendations are intended to ensure a stable underground environment for thermoplastic pipe under a wide range of service conditions. However, because of the numerous flexible plastic pipe products available and the inherent variability of natural ground conditions, achieving satisfactory performance of any one product may require modification to provisions contained herein to meet specific project requirements.

1.2 The scope of this practice necessarily excludes product performance criteria such as minimum pipe stiffness, maximum service deflection, or long term strength. Thus, it is incumbent upon the product manufacturer, specifier, or project engineer to verify and assure that the pipe specified for an intended application, when installed according to procedures outlined in this practice, will provide a long term, satisfactory performance according to criteria established for that application. A commentary on factors important in achieving a satisfactory installation is included in Appendix X1.

Ключевые слова:
backfill; bedding; compaction; embedment; haunching; migration; sewer pipe; soil stiffness; thermoplastic; underground installation; Backfill; Deflection--plastics; Gravity sewer pipe; Haunching; Sewer pipe (thermoplastic); Thermoplastic pipe/tube/fittings; Underground installation--water supply/distribution systems