(812) 309-78-59
(495) 223-46-76
BS 5974:2017
Planning, design, setting up and use of temporary suspended access equipment. Code of practice
56 стр.
Действует
Печатная копияПечатное издание
384.05 £ (включая НДС 20%)
Разработчик:
Зарубежные/BSI
ICS:
91.220 Construction. Including scaffolding, mixers for concrete and mortar, etc. / Строительное оборудование. Включая строительные леса, бетоносмесители и мешалки для строительных растворов и т.д.
Ключевые слова:
Temporary structures|Management|Decking (scaffolding)|Electrical safety|Mobile working platforms|Lightning|Scaffolds|Passenger hoists|Suspended scaffolds|Ropes|Roofs|Design calculations|Loading|Occupational safety|Scaffolding fixing components|Scaffolding processes|Safety anchorages|Construction equipment|Stability|Safety lines|Erecting (construction operation)|Marking|Construction workers|Lifting equipment|Strength of materials|Electrical equipment|Bosuns chairs|Inspection|Cradles (hoists)|Construction operations|Dimensions|Safe working load|Training|Design|Scaffolding components|Winches|Structural design|Factor of safety