6.1 This practice is for removing specimens from existing modified bitumen roof membranes for visual assessment and evaluation for abnormalities in the membrane.
6.2 This practice is not intended for roofs under construction.
Область применения1.1 This practice is for removing specimens from existing modified bitumen roof membranes for visual assessment and evaluation for abnormalities in the membrane. The roof membrane consists of one or more plies/sheet materials in which at least one ply is a modified bitumen (MB) sheet, and which is installed with one or more of the following methods: hot asphalt, heat welding (open flame torching or heated air), cold adhesive, or self-adhesive. The roof membrane may consist of one or more plies of the following:
1.1.1 SBS (styrene-butadiene-styrene), APP (attactic polypropylene), or other polymer, modified bitumen sheet materials.
1.1.2 An exposed modified bitumen sheet material, that is, a modified cap sheet, covering multiple layers of built-up roofing (BUR) plies.
1.1.3 Any adhesive or bitumen component used to install the roof membrane.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.3 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.