Static welded cylindrical tanks, serially produced for the storage of liquefied petroleum gas (LPG) having a volume not greater than 13 m$u3 and for installation above ground. Design and manufacture— 56 стр.
Static welded steel cylindrical tanks, serially produced for the storage of liquefied petroleum gas (LPG) having a volume not greater than 13 m$u3 and for installation underground. Design and manufacture— 58 стр.
Specification and qualification of welding procedures for metallic materials. Welding procedure test. Arc and gas welding of steels and arc welding of nickel and nickel alloys— 36 стр.
Specification and approval of welding procedures for metallic materials. Welding procedure test for pipeline welding on land and offshore site butt welding of transmission pipelines— 22 стр.
LPG equipment and accessories. Transportable liquefied petroleum gas (LPG) welded steel pressure drums with a capacity between 150 litres and 1000 litres— 60 стр.
Specification and qualification of welding procedures for metallic materials. Welding procedure test. Arc and gas welding of steels and arc welding of nickel and nickel alloys— 38 стр.
Specification for the design and manufacture of site built, vertical, cylindrical, flat-bottomed, above ground, welded, steel tanks for the storage of liquids at ambient temperature and above— 250 стр.
Transportable gas cylinders. Specification for welded pressure drums up to 1000 litre capacity for the transport of gases. Design and construction— 46 стр.
Water-tube boilers and auxiliary installations. Requirements for flue gas DENOX-systems using liquified pressurized ammonia and ammonia water solution— 28 стр.
District heating pipes. Preinsulated bonded pipe systems for directly buried hot water networks. Joint assembly for steel service pipes, polyurethane thermal insulation and outer casing of polyethylene— 34 стр.