District heating pipes. Preinsulated bonded pipe systems for directly buried hot water networks. Pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene— 54 стр.
Welding and allied processes. Types of joint preparation. Manual metal arc welding, gas-shielded metal arc welding, gas welding, TIG welding and beam welding of steels— 22 стр.
Plastics piping and ducting systems. Determination of the long-term hydrostatic strength of thermoplastics materials in pipe form by extrapolation— 38 стр.
Preparation of steel substrates before application of paints and related products. Visual assessment of surface cleanliness. Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings— 100 стр.
Welded steel tubes for pressure purposes. Technical delivery conditions. Electric welded non-alloy and alloy steel tubes with specified elevated temperature properties— 30 стр.
District heating pipes. Preinsulated bonded pipe systems for directly buried hot water networks. Joint assembly for steel service pipes, polyurethane thermal insulation and outer casing of polyethylene— 34 стр.
BS EN 488. District heating pipes. Bonded single pipe systems for directly buried hot water networks. Factory made steel valve assembly for steel service pipes, polyurethane thermal insulation and a casing of polyethylene— 30 стр.
BS EN 448. District heating pipes. Bonded single pipe systems for directly buried hot water networks. Factory made fitting assemblies of steel service pipes, polyurethane thermal insulation and a casing of polyethylene— 35 стр.
District heating pipes. Preinsulated bonded pipe systems for directly buried hot water networks. Pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene— 56 стр.