Connectors for electronic equipment - Tests and measurements - Part 9-3: Endurance tests - Test 9c: Mechanical operation (engaging/separating) with electrical load— 19 стр.
Connectors for electronic equipment. Tests and measurements. Endurance tests. Test 9c. Mechanical operation (engaging/separating) with electrical load— 12 стр.
Connectors for electronic equipment - Tests and measurements - Part 99-001: Test schedule for engaging and separating connectors under electrical load - Test 99a: Connectors used in twisted pair communication cabling with remote power— 22 стр.
Connectors for electronic equipment. Tests and measurements. Test schedule for engaging and separating connectors under electrical load. Test 99a: Connectors used in twisted pair communication cabling with remote power— 14 стр.
Telecommunications equipment and telecommunications cabling. Specification for installation, operation and maintenance, Specification for installation, operation and maintenance— 18 стр.