Construction contract procedures (VOB); part C: general technical specifications in construction contracts (ATV); installation of central heating systems and hot water supply systems— 20 стр.
Heating plants for district heating - Part 1: Safety requirements for domestic substations, stations and domestic systems to be connected to hot-water district heating networks— 35 стр.
Medium Temperature Hot Water Systems (MTHWS) with a boiler flow temperature up to 120 °C - Specification for open systems and sealed systems with pressurisation by gravity using a column of water or by safety valves - Safety equipment— 8 стр.
Medium Temperature Hot Water Systems (MTHWS) with a boiler flow temperature up to 120 °C - Specification for sealed systems using thermostatic control - Safety equipment— 20 стр.
Medium Temperature Hot Water Systems (MTHWS) with a boiler flow temperature up to 95 °C and forced flow boilers with rated output up to 50 kW; specification for sealed systems using thermostatic control; safety equipment— 5 стр.
Safety requirement for heat generating installations with flow temperatures up to 120 °C; closed water-heating-plants with thermostatic safety requirements with a static height of more than 15 m or heat-output of more than 350 kW
High temperature water central heating systems with flow temperatures higher than 110 °C (protection against pressures over 0.5 atь) - Equipment and installation— 10 стр.
Water heaters and water heating installations for drinking water and service water; corrosion protection on the water side by corrosion-resistant metallic materials; requirements and testing— 4 стр.
Water heaters and water heating installations for drinking water and service water; corrosion protection on the water side by means of thermoplastic coating materials; requirements and testing— 5 стр.
Process heat installations for more than one kind of energy; one boiler for solid fuel and one for oil or gas and only one chimney; safety requirements and tests— 10 стр.
Steel tanks erected on site, for the above ground storage of hazardous flammable water polluting liquids of class A III and of non-flammable water polluting liquids; requirements and testing— 4 стр.
Steel tanks erected on site, for the above ground storage of hazardous flammable water polluting liquids of class A III and of non-flammable water polluting liquids; design— 4 стр.
German construction contract procedures - Part C: General technical specifications for building works - General rules for all kinds of building works— 15 стр.
District Heating Pipes - Preinsulated bonded pipe systems for directly buried hot water networks - Pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene; German version EN 253:2003/A2:2006— 7 стр.
Air conditioners, liquid chilling packages and heat pumps with electrically driven compressors - Heating mode - Part 1: Terms, definitions and designations; German version EN 255-1:1997— 5 стр.
Contract procedures for building works - Part C: General technical specifications for building works; systems for heating and central water heating— 21 стр.
Tendering and performance stipulations in contracts for construction works (VOB); part C: general technical specifications in contracts for construction works (ATV); installation of central heating systems and hot water supply systems— 20 стр.
Tendering and performance stipulations in contracts for construction works (VOB); part C: general technical specifications in contracts for construction works (ATV); installation of central heating systems and hot water supply systems— 20 стр.
Contract procedures for building works - Part C: General technical specifications for building works; systems for heating and central water heating— 21 стр.