Pipe classes for process plants - Part 12: Technical delivery conditions for pipe components of non alloyed and alloyed steel with specified properties at elevated temperatures of material group 1.2 and 5.1— 77 стр.
Fasteners - Technical specifications - Part 13: Parts for bolted connections with specific mechanical properties for use at temperatures ranging from -200 °C to +700 °C— 12 стр.
Pressure equipment - Part 5: Inspection documentation of metallic materials and compliance with the material specification; German version EN 764-5:2014— 16 стр.
Pressure equipment - Part 7:Safety systems for unfired pressure vessels; German version EN 764-7:2002, Corrigenda to DIN EN 764-7:2002-09; German version EN 764-7:2002/AC:2006— 3 стр.
Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges; German version EN 1092-1:2007+A1:2013— 132 стр.
Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC; German version EN 1515-4:2009— 22 стр.
Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties; German version EN 10028-2:2009— 26 стр.
Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties; German version EN 10216-2:2013— 47 стр.
Steel forgings for pressure purposes - Part 1: General requirements for open die forgings (includes Amendment A1:2002); German version EN 10222-1:1998 + A1:2002— 22 стр.
Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperature properties (including corrigendum AC:2000); German version EN 10222-2:1999 + AC:2000— 17 стр.
Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements; German version EN 10253-2:2007— 125 стр.
Butt-welding pipe fittings - Part 4: Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements; German version EN 10253-4:2008— 110 стр.
Metallic industrial piping - Part 6: Additional requirements for buried piping; German version EN 13480-6:2012; Corrigendum to DIN EN 13480-6:2014-12— 7 стр.
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012, Corrigendum to DIN EN 13480-8:2014-12— 24 стр.
Welding and allied processes - Types of joint preparation - Part 1: Manual metal-arc welding, gas-shielded metal-arc welding, gas welding, TIG welding and beam welding of steels (ISO 9692-1:2013); German version EN ISO 9692-1:2013— 19 стр.
Welding personnel - Qualification testing of welding operators and weld setters for mechanized and automatic welding of metallic materials (ISO 14732:2013); German version EN ISO 14732:2013— 24 стр.
Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys (ISO 15614-1:2004 + Amd 1:2008 + Amd 2:2012); German version EN ISO 15614-1:2004 + A1:2008 + A2:2012— 38 стр.
Pipe classes for process plants - Part 12: Technical delivery conditions for pipe components of non alloyed and alloyed steel with specified properties at elevated temperatures of material group 1.2 and 5.1