Pipe classes for process plants - Part 12: Technical delivery conditions for pipe components of non alloyed and alloyed steel with specified properties at elevated temperatures of material group 1.2 and 5.1— 77 стр.
Pipe classes for process plants - Part 12: Technical delivery conditions for pipe components of non alloyed and alloyed steel with specified properties at elevated temperatures of material group 1.2 and 5.1
Fasteners - Technical specifications - Part 13: Parts for bolted connections with specific mechanical properties for use at temperatures ranging from -200 °C to +700 °C— 12 стр.
Pressure equipment - Part 5: Inspection documentation of metallic materials and compliance with the material specification; German version EN 764-5:2014— 16 стр.
Pressure equipment - Part 7:Safety systems for unfired pressure vessels; German version EN 764-7:2002, Corrigenda to DIN EN 764-7:2002-09; German version EN 764-7:2002/AC:2006— 3 стр.
Flanges and their joints - Circular flanges for pipes, valves, fittings and accessories, PN designated - Part 1: Steel flanges; German version EN 1092-1:2007+A1:2013— 132 стр.
Flanges and their joints - Bolting - Part 4: Selection of bolting for equipment subject to the Pressure Equipment Directive 97/23/EC; German version EN 1515-4:2009— 22 стр.
Flat products made of steels for pressure purposes - Part 2: Non-alloy and alloy steels with specified elevated temperature properties; German version EN 10028-2:2009— 26 стр.
Seamless steel tubes for pressure purposes - Technical delivery conditions - Part 2: Non-alloy and alloy steel tubes with specified elevated temperature properties; German version EN 10216-2:2013— 47 стр.
Steel forgings for pressure purposes - Part 1: General requirements for open die forgings (includes Amendment A1:2002); German version EN 10222-1:1998 + A1:2002— 22 стр.
Steel forgings for pressure purposes - Part 2: Ferritic and martensitic steels with specified elevated temperature properties (including corrigendum AC:2000); German version EN 10222-2:1999 + AC:2000— 17 стр.
Butt-welding pipe fittings - Part 2: Non alloy and ferritic alloy steels with specific inspection requirements; German version EN 10253-2:2007— 125 стр.
Butt-welding pipe fittings - Part 4: Wrought austenitic and austenitic-ferritic (duplex) stainless steels with specific inspection requirements; German version EN 10253-4:2008— 110 стр.
Metallic industrial piping - Part 6: Additional requirements for buried piping; German version EN 13480-6:2012; Corrigendum to DIN EN 13480-6:2014-12— 7 стр.
Metallic industrial piping - Part 8: Additional requirements for aluminium and aluminium alloy piping; German version EN 13480-8:2012, Corrigendum to DIN EN 13480-8:2014-12— 24 стр.
Welding and allied processes - Types of joint preparation - Part 1: Manual metal-arc welding, gas-shielded metal-arc welding, gas welding, TIG welding and beam welding of steels (ISO 9692-1:2013); German version EN ISO 9692-1:2013— 19 стр.
Welding personnel - Qualification testing of welding operators and weld setters for mechanized and automatic welding of metallic materials (ISO 14732:2013); German version EN ISO 14732:2013— 24 стр.
Specification and qualification of welding procedures for metallic materials - Welding procedure test - Part 1: Arc and gas welding of steels and arc welding of nickel and nickel alloys (ISO 15614-1:2004 + Amd 1:2008 + Amd 2:2012); German version EN ISO 15614-1:2004 + A1:2008 + A2:2012— 38 стр.