Каталог стандартов

+7 (495) 223-46-76 +7 (812) 309-78-59
inform@normdocs.ru

IEC 61784-5-2:2010 ed2.0

Заменен
Industrial communication networks - Profiles - Part 5-2: Installation of fieldbuses - Installation profiles for CPF 2 — 332 стр.
IEC 61784-5-2:2010 specifies the installation profiles for CPF 2 (CIPTM1). The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2010. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following technical changes with respect to the previous edition:
- updates pertaining to current installation practices;
- addition of new technology that has become recently available;
- errors have been corrected;
- improved alignment with IEC 61918. This bilingual version (2012-02) corresponds to the monolingual English version, published in 2010-07.

This publication is to be read in conjunction with IEC 61918:2010.
ICS
35.100.40 Transport layer / Транспортный уровень
25.040.40 Industrial process measurement and control / Измерение и контроль производственного процесса