Thermoplastics piping systems - End-load bearing mechanical joints between pressure pipes and fittings - Test method for resistance to pull-out under constant longitudinal force
Plastics piping systems - Mechanical joints between fittings and polyolefin pressure pipes - Test method for leaktightness under internal pressure of assemblies ......(abbreviated)
Thermoplastics piping systems - End-load bearing joints between small diameter pressure pipes and fittings - Test method for leaktightness under internal water .......(abbreviated)
Plastics piping systems - Elastomeric sealing ring type joints and mechanical joints for thermoplastics pressure piping - Test method for leaktightness under .........(abbreviated)
Plastics piping systems - Thermoplastics pipes and fittings for hot and cold water - Test method for the resistance of mounted assemblies to temperature cycling
Plastics piping systems - Thermoplastics pipes and associated fittings for hot and cold water - Test method for resistance of joints to pressure cycling
Gas infrastructure - Pipelines for maximium operating pressure up to and including 16 bar - Part 5: Service lines - Specific functional requirements; German version EN 12007-5:2014— 28 стр.
Building environment design - Design, dimensioning, installation and control of embedded radiant heating and cooling systems - Part 5: Installation; German version FprEN ISO 11855-5:2015— 18 стр.
Plastics piping systems for hot and cold water installations - Chlorinated poly(vinyl chloride) (PVC-C) - Part 3: Fittings (ISO 15877-3:2009); German version EN ISO 15877-3:2009— 35 стр.
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 3: Fittings (ISO 15874-3:2003); German version EN ISO 15874-3:2003— 25 стр.
Plastics piping systems for hot and cold water installations - Polybutylene (PB) - Part 3: Fittings (ISO 15876-3:2003); German version EN ISO 15876-3:2003— 21 стр.
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 3: Fittings (ISO 15874-3:2013); German and English version EN ISO 15874-3:2013— 47 стр.
Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 3: Fittings (ISO 22391-3:2009)
Plastics piping systems for hot and cold water installations - Chlorinated poly(vinyl chloride) (PVC-C) - Part 3: Fittings (ISO 15877-3:2009 + Amd 1:2010) (consolidated version)
Plastics piping systems for hot and cold water installations - Polypropylene (PP) - Part 3: Fittings (ISO 15874-3:2013 + Amd 1:2018) (consolidated version)
Plastics piping systems for hot and cold water installations - Crosslinked polyethylene (PE-X) - Part 3: Fittings (ISO 15875-3:2003 + Amd.1:2020) (consolidated version)
Multi-layer composite piping systems made of plastics with a metallic inner layer for hot and cold water installation inside buildings - Requirements for pipes, fittings and the system
Safety and control devices for oil burners and oil-burning appliances - Particular requirements - Part 1: Automatic and semi-automatic valves (ISO 23553-1:2014)
Plastics piping systems for hot and cold water installations - Polyethylene of raised temperature resistance (PE-RT) - Part 3: Fittings (ISO 22391-3:2009 + Amd.1:2020) (consolidated version)