Каталог стандартов

+7 (495) 223-46-76 +7 (812) 309-78-59
inform@normdocs.ru

SAE AS683E

Действует
Installation Procedures and Torques for Fluid Connections
These procedures cover the following:
  1. Section 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
  2. Section 4 - Boss end connections, positioned type, with back-up ring.
  3. Section 5 - Boss end connections, positioned type, without back-up ring.
  4. Section 6 - Boss end connections, non-positioned type.
  5. Section 7 - Bulkhead connections.