Каталог стандартов

+7 (495) 223-46-76 +7 (812) 309-78-59
inform@normdocs.ru

SAE AS683D

Заменен
Installation Procedures and Torques for Fluid Connections
These procedures cover the following:
  1. Paragraph 3 - Cone end connections for flared tube and brazed ferrule, with and without gasket.
  2. Paragraph 4 - Boss end connections, positioned type, with back-up ring.
  3. Paragraph 5 - Boss end connections, positioned type, without back-up ring
  4. Paragraph 6 - Boss end connections, non-positioned type.
  5. Paragraph 7 - Bulkhead connections.
Тематика
Gas turbines
Parts
Hybrid engines
Hydraulic systems
Jet engines